Latest Projects

Here is a selection of the most recent machines and projects successfully delivered by Aerlift

Product information: Self-propelled modular trailer designed to lift and transport 400t vessels from the synchro-lift platform to the hardstand area for maintenance. Modular additional 200t extension was subsequently ordered thus increasing length and capacity to a maximum of 600t when required.

Product information: The development of the Hunter Valley Expressway had at its core an ASCOM 110T Straddle Carrier which in a concentrated period of 16 months, and working 20 hours a day, moved in excess of 760 concrete segments weighing from 48t to 108t. Each segment through its different processes was moved on average 5 times…not…

Product information: Remote controlled motorised 50t boat hoist.

Product information: Remote controlled mobile gantry / segment carrier with a maximum capacity of 130t. Custom designed to lift and transport section of plant equipment into custom built workshops for repairs and maintenance

Ascom / AerLift delivered two machines to the Gold Coast City Marina (GCCM) facility located in Coomera on the Gold Coast in Queensland. Arriving in 8 x 40’ open top containers, the assembly, testing, and commissioning project, took 4 weeks. The BHT250 boat hoist has an industry leading “fore / aft” dual wheel arrangement, at…